Survey Set-ups
Sometimes a job gets cancelled after we've set it up but before we go into the field. We still charge for the work we've done. Here's a list of what that involves. Setups * look up revision block for previous staking * when plot plan is to the hundredth stakeout has already been calc'd. * show setbacks on workup. * include benchmark and finish floor elevation. * give crew workup, plat and vacant survey notes. * if calculating building: * driveway, entrance and walk, wing walls, and porch must appear as On plans, including notation, or permit may not be issued. * building overhang cannot be in easement. * setbacks concern walls. * be sure building squares. * show four sides of squareout. * diagonal * coordinate property corners and building corners (include Squareout) * add tenth to setbacks (when possible). Disclaimer * any construction other than shown hereon would require field staking By this office. * (zee lots) property corners not shown otherwise are monumented by Building corners or walls as shown.