Site Plans
* do drawing checklist first * title is boundary and site plan * revision note if needed * review title commitment and note it (if in package or requested) * architect's plans generally show the road on the bottom (Rather than north on top) * septic tank should be center of lot 75' from lake or canal * adj lots vacant or occupied (well & septic within 100') Note adjacent f.f. Elevs Note no wells or no septic Note public wells or sewers * flood zone w/map info * all right-of-way info (used for setbacks) * lot area (gross and net) * porches must not violate setbacks ( sidewalks & driveways can). * driveway, entrance and walk, wing walls, and porch must appear as on Plans, including notation, or permit may not be issued. * city-type sidewalks may be required despite not being on plans. (Check) * centerline road, swale, and lot corner elevations required by county To determine necessary fill. * close building (existing and new) For building stakeouts - include overalls - Add through and scale setbacks and overalls - compare to lot line (This is where you'll get nailed) * scale building setbacks & distances * tie building on four sides * issue a boundary survey and a survey with site plan (two drawings) * elev's on core site, all corners, top of water, Road. * site benchmark, ngvd note, legend, base bench * hrs forms * altera forms no longer done by us * certify compliance with title commitment - schedule a as well as Schedule b (get schedule and docs from title company) * include note: driveway swales to meet p.bch. Co. Requirements * draw in drainfield and unobstructed area * usually need 3 year 24 hour flood elev.